Home / Applications / Partition Panels

Partition Panels

PAC Partition panels system is the best solution for high rise buildings where speed is needed to complete all interior walls (10 cm or 15 cm) and exterior walls (20cm or 25 cm or 30 cm) in conjunction with the completion of post tension slabs usually 2 weeks for each floor. PAC Panels can be erected before slab casting by tower head crane especially 20 cm or 25 cm panels which are heavier in weight or by Special trolley provided by ESPAC for 10 cm and 15 cm panels after the slab casting.

Products Applied:

  • PAC Vertical Panels
  • PAC Horizontal Panels
  • PAC Lintels

Benefits:

  • Lightweight panels reduces thickness of post tension slab
  • Lightweight panels reduces steel in post tension slab
  • Lightweight panels reduces number of columns
  • Lightweight panels reduces cost of foundation
  • Speed in production and delivery
  • Fast installation process
  • High thermally insulated structure
  • High sound insulation
  • Fire rating 6 hours
  • No plastering required
  • Less labor intensive than conventional concrete structures

Applicable for:

  • High rise buildings
  • Shopping malls
  • Hotels

Method Statement

Here you can download the method statement which provides a detailed step by step guide on how the installation of the Partition Panels should be completed.

Connection Details

For a detailed diagram showing the connection details for the Partition Panels download the PDF here.

  • Marina Breeze

    Project Name :Marina Breeze 1 & 2 - Bahrain

    Client :Durrat Marina

    Consultant :8 Floors Building

    Contractor :Maaster Construction L.L.C

  • 8 Floors Building

    Project Name :Residential Building 8 Floors

    Client :Nasir Ibrahim Nasir

    Consultant :Mohammed Al Gharib Consultants

    Contractor :HH Construction Co

  • 16 Floors Building

    Project Name :Residential Building 16 Floors

    Client :Bokhowa Group - Bahrain

    Consultant :xxx

    Contractor :Bokhowa Constructions